Pacific Parade

730 Pacific Parade, Currumbin
Completed 2017, Contract value of $88000

  • Pressure clean all surfaces for painting at 4000psi
  • Detailed rust treatment, wall defect and concrete damage repair plan developed
  • Full painting works for exterior of each lot of 730 Pacific Parade
  • Full painting works for interior of each lot of 730 Pacific Parade
  • 2-pac engineered coatings to metallic wall panels and balustrading

 

Before Gallery


After Gallery